This is an automated email from the git hooks/post-receive script.
tcwg-buildslave pushed a change to branch linaro-local/ci/tcwg_kernel/gnu-master-arm-next-defconfig in repository toolchain/ci/base-artifacts.
from a27b52398c 15: onsuccess: #434: boot: Success after v7.1.0-759-g42e1e35 [...] new 13a71cba58 16: force: #435: boot: Success after gcc: 43 commits
The 1 revisions listed above as "new" are entirely new to this repository and will be described in separate emails. The revisions listed as "adds" were already present in the repository and have only been added to this reference.
Summary of changes: 01-reset_artifacts/console.log.xz | Bin 1700 -> 1760 bytes 02-prepare_abe/console.log.xz | Bin 2748 -> 2740 bytes 03-build_abe-binutils/console.log.xz | Bin 30660 -> 30628 bytes 04-build_abe-stage1/console.log.xz | Bin 92056 -> 90888 bytes 05-build_abe-qemu/console.log.xz | Bin 31572 -> 31832 bytes 06-build_linux/console.log.xz | Bin 5592 -> 5064 bytes 07-boot_linux/console.log.xz | Bin 5656 -> 5656 bytes 08-check_regression/console.log.xz | Bin 2740 -> 2940 bytes 09-update_baseline/console.log | 2 +- dashboard/dashboard-generate.sh | 4 ++-- git/gcc_rev | 2 +- mail/jira-body.txt | 2 +- mail/mail-body.txt | 2 +- mail/mail-subject.txt | 2 +- manifest.sh | 18 +++++++++--------- 15 files changed, 16 insertions(+), 16 deletions(-)