This is an automated email from the git hooks/post-receive script.
tcwg-buildslave pushed a change to branch linaro-local/ci/tcwg_gcc_build/master-arm in repository toolchain/ci/base-artifacts.
from bacc1452da onsuccess: #322: 1: [TCWG CI] https://ci.linaro.org/job/tcwg [...] new c3c2d16406 onsuccess: #336: 1: [TCWG CI] https://ci.linaro.org/job/tcwg [...]
The 1 revisions listed above as "new" are entirely new to this repository and will be described in separate emails. The revisions listed as "adds" were already present in the repository and have only been added to this reference.
Summary of changes: 01-reset_artifacts/console.log.xz | Bin 2116 -> 2128 bytes 02-prepare_abe/console.log.xz | Bin 2644 -> 2620 bytes 04-build_abe-gcc/console.log.xz | Bin 242836 -> 239476 bytes 04-build_abe-gcc/make-gcc-stage2.log.xz | Bin 206912 -> 204340 bytes 05-check_regression/console.log.xz | Bin 468 -> 468 bytes git/gcc_rev | 2 +- jenkins/build-name | 2 +- jenkins/pw-report.log | 8 ++++---- manifest.sh | 8 ++++---- 9 files changed, 10 insertions(+), 10 deletions(-)