This is an automated email from the git hooks/post-receive script.
tcwg-buildslave pushed a change to branch linaro-local/ci/tcwg_gnu_cross_build/master-arm in repository toolchain/ci/base-artifacts.
from 24d43b12 41: onsuccess: 7: Successful build after binutils/gcc/linux/g [...] new 6fcc3895 42: onsuccess: 7: Successful build after baseline build: no n [...]
The 1 revisions listed above as "new" are entirely new to this repository and will be described in separate emails. The revisions listed as "adds" were already present in the repository and have only been added to this reference.
Summary of changes: 01-reset_artifacts/console.log.xz | Bin 1728 -> 1684 bytes 02-prepare_abe/console.log.xz | Bin 2744 -> 2740 bytes 04-build_abe-binutils/console.log.xz | Bin 30300 -> 30380 bytes 05-build_abe-stage1/console.log.xz | Bin 91476 -> 91644 bytes 07-build_abe-linux/console.log.xz | Bin 9012 -> 9004 bytes 08-build_abe-glibc/console.log.xz | Bin 234236 -> 234268 bytes 09-build_abe-stage2/console.log.xz | Bin 223716 -> 222980 bytes 10-build_abe-gdb/console.log.xz | Bin 37536 -> 37596 bytes 11-build_abe-qemu/console.log.xz | Bin 31320 -> 31240 bytes 12-check_regression/console.log.xz | Bin 2700 -> 1540 bytes mail/jira-body.txt | 11 +---------- mail/mail-body.txt | 11 +---------- mail/mail-subject.txt | 2 +- manifest.sh | 20 ++++++++++---------- 14 files changed, 13 insertions(+), 31 deletions(-)