Gur Stavi wrote:
Modify test_control_group to have toggle parameter. When toggle is non-zero, loopback device will be set down for the initialization of fd[1] which is still expected to successfully join the fanout.
Signed-off-by: Gur Stavi gur.stavi@huawei.com
Reviewed-by: Willem de Bruijn willemb@google.com