== Progress == * Fixed test infrastructure bugs (TCWG 1378 - 8/10). - Installed Foundation Model on all Hetzner machines so aarch64 bare metal testing works. - Refactored all board support files to eliminate duplication to reduce maintainance headaches. Fixed ldflags so now getting good results. - Backport job is working good now. - Worked on Gerrit/Jenkins integration, with the goal of having the notifications work *after* the test and validation is done. - More work on optimizing SSH connections by reducing extraneous commands in the test framework. - Recreated stable branch from master now that results are much better. * Meetings and Misc (2/10) * Fixed National Park internal wireless network, getting access to much better bandwidth than the crappy Guest one. :-)
== Plan == * Escape Yosemite, hard during a great weather window, and being the only person in my group with a job... * Continue fixing remote testing support, merge "boards" branch into master, then make it stable after more testing.